Urban Plateau Turnhout

20006
From 2020 to 2021
The intersection of the Turnhout ring road R13 with the N19 (Steenweg op Zevendonk) is one of the most serious black spots in Flanders.
 A master plan to redesign this intersection and the neighbouring intersection of the R13 with Steenweg op Tielen to make it safer already exists. TML is working on this master plan together with Antea and Buur. This plan takes into account various wishes from the City of Turnhout (adjustments to the local traffic circulation, creation of green spaces, improved cycle relations, etc.), AWV (safety and flow on the R13) and De Lijn (smooth bus connections, including a high quality public transport connection between Turnhout station and the new mobipoint in the northwest corner of the intersection R13 x N19).
In this project, TML is   responsible for the layout of the vertaling? for the traffic lights at both intersections and for micro-simulations of 3 design variants.
 

Period

From 2020 to 2021

Client

AWV Antwerpen

Partner

TV Antea, Buur
© 2021 Transport & Mobility Leuven | Westsite: Online Oplossingen en Webdesign